-- October --

Schuh works on installing new brick on the corner of Walnut and Washington Street.
New brick at the new entrance.
The terrazzo was refinished in the seating area of the coffee shop. The rest of the floor will be wood.
The Old Castle guys installed the glass in the interior corridor.
This is the new interior corridor. The view from the elevators. It's gettin there!
The restaurant is taking shape. Schuh is getting all the drywall up around the kitchen.
The epoxy guys get the space ready to put in the floor for behind the bar in the coffee shop.
Applying the epoxy floor.
The terrazzo in the bar is getting refinished.
The terrazzo guy is sealing the floor.
The HVAC equipment is on this newly constructed mezzanine. Soon there will be another level leading up to the restaurant for emergency use for now.
The kitchen in the restaurant is getting ready for it's epoxy floor.
The coffee shop is getting closer to being done!